ISO 10303-207-1999 工业自动化系统和集成 产品数据表示和交换 第207部分:应用协议 钣金模具规划和设计

百检网 2021-08-05
标准号:ISO 10303-207-1999
中文标准名称:工业自动化系统和集成 产品数据表示和交换 第207部分:应用协议 钣金模具规划和设计
英文标准名称:Industrial automation systems and integration - Product data representation and exchange - Part 207: Application protocol: Sheet metal die planning and design
标准类型:L56
发布日期:1999/12/31 12:00:00
实施日期:1999/12/31 12:00:00
中国标准分类号:L56
适用范围:This part of ISO 10303 specifies the use of the integrated resources necessary for the scope and information requirements for the exchange of information between contractors and suppliers to enable the eventual manufacture of sheet metal dies used in the production process of sheet metal parts. NOTE 1 - The application activity model, in annex G, provides a graphical representation of the processes and information flows that are the basis for the definition of the scope of this part of ISO 10303. The following are within the scope of this part of ISO 10303: —Types of products supported: NOTE 2 - This list describes the types of products for which data are in scope. The list following this one describes types of product data which are in scope. a) Sheet metal part design data; EXAMPLE 1 - Sheet metal part designs may be for sheet metal parts intended for the exterior of a product, those intended for the interior of a product, those intended to be in view or not in view on the final product, or those intended to support loads or maintain structure of a product. Sheet metal part designs may also be for sheet metal parts that are products in themselves. b) Sheet metal die design data, including die face design and die structure design, for an individual die against which sheet metal is formed by processes that do not involve a mating die; c) Sheet metal die set design data, including die face design and die structure design, for die sets used in a stamping press machine to manufacture sheet metal parts; d) Sheet metal part manufacture description data. —Types of product data supported: a) Design data for materials, sheet metal in-process parts, sheet metal parts, die components, individual dies, and die sets; b) Process data for sheet metal part manufacture; c) Change and schedule data for design of product definition data and manufacture description data; d) Data ownership, generating system information, and exchange history surrounding product definition data and manufacture description data; e) The identification of externally designed parts and purchased items; f) Design constraints on dies; g) Wireframe, surface, and solid geometry; h) Data describing the relative position of materials and in-process sheet metal parts to the die or dies that will further form them; i) Composition of materials, sheet metal parts, and die components; j) Properties associated with materials or with collections of geometric representations, such as hardness, porosity, method of manufacture, and function. —Stages in the product life cycle supported are data at any stage of completion that describe: a) Materials; b) Sheet metal in-process parts and sheet metal parts; c) Die components, individual dies, and die sets; d) Sheet metal part manufacture description data; e) Change and schedule data for design of product definition data and manufacture description data. —The supported exchange scenarios from contractor to supplier are as follows: a) requirements to enable the supplier to create a sheet metal part processing plan for the contractor, such as the sheet metal part design, available presses and plants, and plant and press constraints; b) requirements to enable the supplier to create a die design for the contractor, such as the sheet metal part design and the sheet metal part processing plan. This design may be for the die face, or for the die structure, or for both; NOTE 3 - Requests for changes by contractors are considered to be the exchange of additional requirements. c) exchanges wherein the contractor and supplier are divisions of the same company; d) exchanges wherein the contractor and supplier are different companies. —The supported exchange scenarios from supplier to contractor are as follows: a) a part process plan or any portion thereof; b) a complete die design or any portion thereof; c) a die face design or any portion thereof; d) a die structure design or any portion thereof; e) a change request; f) exchanges wherein

百检能给您带来哪些改变?

1、检测行业全覆盖,满足不同的检测;

2、实验室全覆盖,就近分配本地化检测;

3、工程师一对一服务,让检测更精准;

4、免费初检,初检不收取检测费用;

5、自助下单 快递免费上门取样;

6、周期短,费用低,服务周到;

7、拥有CMA、CNAS、CAL等权威资质;

8、检测报告权威有效、中国通用;

客户案例展示

  • 上海朗波王服饰有限公司
  • 浙江圣达生物药业股份有限公司
  • 天津市长庆电子科技有限公司
  • 上海纽特丝纺织品有限公司
  • 无锡露米娅纺织有限公司
  • 东方电气风电(凉山)有限公司